Bill of Quantities
The Bill of Quantities (BoQ) is a bill of all key items in the facility. These items include those directly calculated by AUTOPV and other estimates.
The BoQ is available as a concept and detailed design output.
The concept design BoQ includes the key equipment and civil works.
The detailed design BoQ has a block level breakdown of facility items and additionally includes cabling, cable management, trenching, piling and C&I equipment.
For a detailed discussion on the accuracy of the bill and how each item in the bill is determined, see Guide to the Bill of Quantities.
You can download a sample Concept Bill of Quantities and Detailed Bill of Quantities.
⚠️ Sample documents provided here does not represent an actual project site and the information contained in these samples should not be relied upon.