Overview

Accuracy

One of AUTOPV™’s primary differentiators is the accuracy of the Bill of Quantity that it produces for every project.

The table below provides an estimate of the accuracies for the various areas or layers of the facility.

Contribution to Total BoQ refers to the percentage that this item contributes to the total value of the project or bill.

% of Quantities @ 100% accuracy represents the percentage of quantities within the relevant layer that have a 100% accuracy.

The Average weighted accuracy indicates the overall accuracy based on the value of the relevant layer.

Layer Contribution to Total BoQ % of Quantities @ 100% accuracy Average weighted accuracy
PV Area 67.0% 99.1% 99.6%
MV 1.4% 3.2% 51.6%
Grid Connection 21.7% 0.0% 50.0%
Balance of Plant 1.6% 15.5% 66.1%
Earthing 1.2% 0.0% 50.0%
Lightning protection 0.8% 0.0% 50.0%
General 6.0% 0.4% 74.9%
SCADA 0.3% 0.0% 50.0%
Total 100.0% 66.8% 85.0%

The calculation of each line item is provided in more detail in subsequent sections of this documentation.

While every effort is made to ensure the accuracy of calculations and quantities, the values presented in this table are only estimates.

Legend

The following tags are used in the line item descriptions:

Calculated
Indicates if a quantity is estimated or calculated

100%
Estimated accuracy of quantity

string
String Inverter Architecture

string+
String Inverter with AC Combiner Boxes Architecture

central
Central Inverter Architecture