Sub Array Cables

Method of determination
Calculated
Estimated accuracy
100%
Central Inverter architecture
central

DC Sub Array cables connects the DC combiner boxes to the central inverter or PCU.

These lengths are calculated automatically using AUTOPV’s advanced routing algorithms. By default the lengths include an additional 1m per cable run as well as 1% of the total length per cable run. These tolerances can be set as advanced configuration settings that may not be available to all users.

Calculation

\[ L_{cable}=(L^{\prime}_{cable}+l_m) \times (1+l_{\text{%}}) \]

where:

\[\begin{align*} L^{\prime}_{cable}&=\text{Actual cable length} \\ l_m&=\text{Length correction applied to cable section in}\ m \\ l_{\text{%}}&=\text{Length correction applied to cable section in}\ \text{% of cable length} \\ \end{align*}\]

‼️ This value is auto generated by AUTOPV™, subsequent modification may invalidate the design outcomes.