G5 Layers

Method of determination
Estimated
Estimated accuracy
50%
string
String Inverter architecture
String Inverter with AC Combiner architecture
string+
Central Inverter architecture
central

The total road length is estimated at 135m/MW installed. The G5 layers are estimated at 50% of the total road length.

✎️️ This quantity is estimated and can be adjusted with no impact on the design outcomes.