Longitudinal drainage

Method of determination
Estimated
Estimated accuracy
50%
string
String Inverter architecture
String Inverter with AC Combiner architecture
string+
Central Inverter architecture
central

Longitudinal drainage is estimated at 100% of the road length.

✎️️ This quantity is estimated and can be adjusted with no impact on the design outcomes.